Project Description
Here you can see how Mantrec B.V. an existing oven moved and a new paint stripping ovens has designed, built, installed and commissioned.
For this project, our team handled the entire process: from the initial design to the delivery of a functioning installation. The existing oven was dismantled and moved to its new position, after which the new de-lacquering oven was built, connected, and tested on-site. Our experience in mechanical engineering and heavy industrial installations allowed us to manage design, execution, and commissioning all under one roof, ensuring short communication lines and minimal downtime for the client.
Work in this project:
Engineering and design of the new stripping oven
Inventory and inspection of the existing situation on site
Dismantling and relocation of the old oven
Manufacture and construction of the new paint stripping oven
Placement, alignment and mechanical assembly
Connecting, testing and commissioning the installation
Maintenance and aftercare after completion