
Project Description
For this project, we handled both the engineering and execution of various modifications to a jaw crusher. The machine was experiencing wear and tear, reduced capacity, and an outdated design. Our
For this project, we have the complete construction of a lorry realised in close collaboration with Palfinger English Muns Trucks. The goal was a robust, multi.
From the ground up, the entire system has been developed by our engineering team, with the integration of the Crane installation, chassis modifications and superstructure construction was central. This has taken into account tax distribution, stability, safety, and ease of use.
The crane superstructure is fully integrated with the vehicle, including the optimisation of the strengths and focal points to ensure maximum performance and reliability. Furthermore, all structural components have been calculated and adapted to the specific deployment of the vehicle.
After the engineering phase, we took care of the complete construction, including the installation of the crane, hydraulic systems and supporting structures. Everything has been accurately aligned, tested and checked, so that the vehicle is immediately operational.
The result is a powerful and sustainable total solution, where the vehicle, crane, and superstructure work together perfectly and are ready for intensive daily use in the field.










